A) AC grounding electrode system (e.g., in some countries it may also be known as the earthing system)
B) Telecommunications bonding infrastructure
C) Lightning protection system
D) Equipment grounding system (e.g., in some countries it may also be known as the equipment bonding system)
Correct Answer
verified
Multiple Choice
A) 254 mm (10 in)
B) 305 mm (12 in)
C) 381 mm (15 in)
D) 457 mm (18 in)
E) 610 mm (24 in)
Correct Answer
verified
Multiple Choice
A) 1
B) 3
C) 4
D) 6
E) 9
Correct Answer
verified
Multiple Choice
A) Electromagnetic interference (EMI)
B) Radio Frequency Interference (RFI)
C) (EMC)
D) Fast transients
E) Electrostatic Discharge (ESD)
Correct Answer
verified
Multiple Choice
A) Green
B) Orange
C) Purple
D) Yellow
E) Brown
Correct Answer
verified
Multiple Choice
A) 40 hours
B) 45 hours
C) 50 hours
D) 55 hours
E) 60 hours
Correct Answer
verified
Multiple Choice
A) Purchase and install layer 3 switching equipment.
B) Purchase and install a software based gateway.
C) Add bridges at key points in the network.
D) Segment your network into smaller domains.
Correct Answer
verified
Multiple Choice
A) Trunk and tap
B) Video over balance twisted-pair
C) Video over optical fiber
D) Home run
Correct Answer
verified
Multiple Choice
A) Analogous
B) Parametric
C) Engineering
D) Ledger
E) PERT
Correct Answer
verified
Multiple Choice
A) Trunk and tap
B) Video over balanced twisted-pair
C) Video over optical fiber
D) Home run
Correct Answer
verified
Multiple Choice
A) Less costly
B) Simpler terminations
C) Better high frequency performance
D) More flexible
Correct Answer
verified
Multiple Choice
A) Labeling should be affixed at the ends of each pathway.
B) Pathways should not be labeled at regular intervals to avoid labeling removal during cable installation.
C) Avoid marking conduits from the main equipment room (ER) .
D) Pathways do not need to have unique identifiers as they are only supporting cables.
E) Only pathways containing fire/life/safety systems and electrical system should be labeled to prevent interference with other applications.
Correct Answer
verified
Multiple Choice
A) Trunk and tap
B) Home run
C) Video over balanced twisted-pair
D) Video over optical fiber
Correct Answer
verified
Multiple Choice
A) 152 mm (6 in)
B) 229 mm (9 in)
C) 300 mm (12 in)
D) 381 mm (15 in)
E) 457 mm (18 in)
Correct Answer
verified
Multiple Choice
A) Multiple sheathed cables with field connectorization
B) Multiple sheathed cables using pigtail connectorization
C) Single high fiber count sheathed cable with field connectorization
D) Single sheathed high-fiber-count cable with pigtail connectorization
E) Single sheathed cable equipped with preconnectorized assemblies
Correct Answer
verified
Multiple Choice
A) Install access point
B) Clean work area
C) Install pathway for cabling
D) Confirm wireless coverage
Correct Answer
verified
Multiple Choice
A) 50
B) 75
C) 100
D) 125
E) 150
Correct Answer
verified
Multiple Choice
A) Request for purchase
B) Project schedule
C) Project objective
D) Assumptions
E) Customer needs
Correct Answer
verified
Multiple Choice
A) 5529 square m (60,000 square ft)
B) 7389 square m (80,000 square ft)
C) 9300 square m (100,000 square ft)
D) 11,160 square m (120,000 square ft)
E) 13,300 square m (140,000 square ft)
Correct Answer
verified
Multiple Choice
A) Unshielded twisted-pair (UTP)
B) Shielded twisted-pair (STP)
C) Screened twisted-pair (ScTP)
D) Coaxial
Correct Answer
verified