Correct Answer
verified
View Answer
Multiple Choice
A) IS management
B) the end-users of the system
C) the steering committee
D) the system analyst design team
Correct Answer
verified
Multiple Choice
A) debugging.
B) structured programming.
C) program maintenance.
D) hierarchical program design
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Essay
Correct Answer
verified
Multiple Choice
A) instruction on new hardware and software.
B) orientation to new policies and operations.
C) planning and scheduling so it occurs before system testing and conversion.
D) All of the above are correct.
Correct Answer
verified
Multiple Choice
A) acceptance testing
B) debugging
C) desk checking
D) program walk-through
Correct Answer
verified
Multiple Choice
A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Correct Answer
verified
Multiple Choice
A) managers observing the operation of the system by "walking through" the IT department.
B) processing hypothetical data that are designed to identify errors in the system.
C) processing copies of real transactions in order to determine whether or not the system meets requirements.
D) a thorough review of the procedures and program logic of the system.
Correct Answer
verified
Multiple Choice
A) Modules interact with each other directly and also through the control module.
B) Modules interact with each other directly.
C) Modules interact with only the control module.
D) Modules primarily,but not always,interact with the control module.
Correct Answer
verified
Multiple Choice
A) conceptual systems design
B) implementation and conversion
C) operations and maintenance .
D) physical design
Correct Answer
verified
Multiple Choice
A) changing the data content
B) changing the database
C) changing the file format
D) moving files to a new medium
Correct Answer
verified
Multiple Choice
A) both the old and new AIS are operated simultaneously
B) elements of the old AIS are replaced gradually with elements of the new AIS
C) the new AIS is introduced into one part of the organization,such as a branch
D) the old AIS is terminated as the new AIS is introduced
Correct Answer
verified
Multiple Choice
A) black box testing.
B) debugging.
C) desk checking.
D) white box testing.
Correct Answer
verified
Multiple Choice
A) accuracy
B) audit trail
C) numerical control
D) validity
Correct Answer
verified
Multiple Choice
A) form size
B) format
C) medium
D) organization and access
Correct Answer
verified
Multiple Choice
A) it can be used to guide physical systems design activities
B) it communicates how management and user information needs will be met
C) it discusses the design alternatives that were not selected for the project
D) it helps the steering committee assess system feasibility
Correct Answer
verified
Essay
Correct Answer
verified
Multiple Choice
A) controls design
B) input design
C) output design
D) program design
Correct Answer
verified
Multiple Choice
A) Direct
B) Parallel
C) Pilot
D) Phase-in
Correct Answer
verified