_______ is used to request that the company produce a specified quantity of goods.


A) Production Order
B) Planned Order
C) Purchase Order
D) Sales Order

E) None of the above
F) All of the above

Correct Answer

verifed

verified

___________ is taking raw materials,such as plastic pellets,and creating something from them,such as a plate or a cup.


A) Assembling
B) Manufacturing
C) Discrete manufacturing
D) Process manufacturing

E) B) and C)
F) C) and D)

Correct Answer

verifed

verified

Which of the following information is not necessary to process a planned order?


A) Requested delivery date
B) Delivery location
C) production order number
D) planned order number

E) None of the above
F) All of the above

Correct Answer

verifed

verified

Which of the following identifies the parts needed to make one unit of a product?


A) product routing
B) bill of material
C) engineering drawing
D) packing list

E) None of the above
F) B) and C)

Correct Answer

verifed

verified

___________ involves taking a number of component materials,such as a board,nuts and bolts,and putting them together to produce the desired finished product,such as a skateboard.


A) assembling
B) manufacturing
C) discrete manufacturing
D) process manufacturing

E) B) and D)
F) C) and D)

Correct Answer